Idaho Mining Conference Presentation
Released
Released
Announcement PDF
MARKET ANNOUNCEMENT
ElkRange Mining Limited (ASX : ELK) | ACN: 684 549 620 | ABN: 39 684 549 620
Unit 11, 12-14 Thelma Street,West Perth,WA6005 | info@elkrange.com.au elkrange.com.au
27 October 2026
Idaho Mining Forum Presentation
Elk Range Mining Limited (ASX: ELK) ("Elk Range" or the "Company") is pleased to provide the attached
presentation to be delivered by Chief Executive Officer, Mr Edward Keys, at the Idaho Mining Forum in Boise,
Idaho, USA on 27 October 2026 (US Mountain Time), being 28 October 2026 (Australian time).
The presentation provides an overview of the Company's Idaho gold projects, current exploration activities
and strategic priorities, including the results from maiden drill hole 26FRD001 at the Friday Gold Project
announced to ASX on 27 October 2026.
This announcement has been authorised for release by the Board of Directors of Elk Range Mining Limited.
Enquiries
Investor Relations
Leanne Kite
Executive Director – Elk Range Mining
T: +61 401 438 850 E: leanne@elkrange.com.au
Media Contact
Luke Forrestal
Director – GRA Partners
T: +61 411 479 144 E: luke.forrestal@omc.com
Follow Elk Range Mining on:
About Elk Range Mining
Elk Range Mining Limited is an Australian-listed gold exploration and development company focused on
advancing a portfolio of projects in Idaho, USA. The Company's assets include the Friday Gold Mine, the
Orogrande Processing Plant and the Buffalo Gulch and Deadwood Projects, providing exposure to both
established infrastructure and significant exploration upside.
Important Information
This announcement contains forward-looking statements which are identified by words such as "may",
"could", "believes", "estimates", "expects", "anticipates", "intends", "plans" and similar expressions. Forward-
looking statements inthis announcement include, but are notlimited to, statements regarding the Company's
exploration strategy, planned drilling programme, permitting activities, project advancementand other future
events or expectations.
These statements are based on the Company's current expectations, assumptions and beliefs concerning
future events. Forward-looking statements are subject to known and unknown risks, uncertainties and other
factors, many of which are beyond the control of the Company, that may cause actual results, performance
or achievements todiffer materially from those expressed orimplied in such statements. These risks include,
but are not limited to, exploration results, geological conditions, commodity prices, permitting andregulatory
approvals, funding availability, operational risks, environmental risks and general economic and market
conditions.
Forward-looking statements are notguarantees of future performance and should not be relied upon as such.
The Company, its Directors and management do not give any assurance that the results, performance or
achievements expressed or implied by the forward-looking statements contained in this announcement will
occur. Except as required by law or the ASX Listing Rules, the Company undertakes no obligation toupdate or
revise any forward-looking statements, whether as a result of new information, future events or otherwise.
A unique gold
opportunity
October 2026 | ASX: ELK
27/10/2026
Idaho Mining Conference
Presentation
Important Notice
2
Disclaimer
This presentation has been prepared and issued by Elk Range Mining Limited (Elk Range or Company) to provide general information about the Companyon the basis that
you agree, in favour of the Company and its directors, officers, employees, agents, advisers and consultants (together, the Limited Parties), to be bound by the terms and
conditionsdetailed in this presentation. The followingdisclaimers apply to this presentation, and you are therefore advised to read this carefully before reading or making
any other use of this presentation or any informationcontained in it. The informationcontained in this presentation is summary informationonly and is given in good faith.
The information in thispresentation is general in nature and does not purport to be accurate or complete. It does not contain all of the information that an investor may
require in evaluating a possible investment in the Company, nor all the informationwhich would be required in a disclosure document or prospectus prepared in
accordance with the requirements of the CorporationsAct 2001 (Cth) (Corporations Act) or other legislation. Certain informationin this presentation has been derived
from third parties. Although the Company has no reason to believe that it is not accurate, reliable or complete, it has not been independentlyaudited or verified by the
Company. The presentation has been prepared by the Company with due care, but no representation or warranty, express or implied, is provided in relation to the
accuracy, reliability, fairness or completeness of the information, opinionsor conclusionsin this presentation by the Companyor any other party involvedin its
preparation, except as required by law.
This presentation should be read in conjunctionwith the Company’s prospectus dated 17 June 2026, the supplementary prospectus dated 25 June 2026 and the second
supplementary prospectus dated 31 July 2026 (Second Supplementary Prospectus) (collectively, the Prospectus), and the Company’s other periodic and continuous
disclosure announcements. All amounts are in Australian dollars unless stated otherwise.
Not an offer
This presentation is for informationpurposes only and does not constitute an offer, invitation, solicitationor recommendationto subscribe for, buy or sell any securities in
any jurisdiction. In particular, this presentation does not constitute an offer to sell, or a solicitationof an offer to buy, securities in the United States. The Company’s
securities have not been, and will not be, registered under the US Securities Act of 1933, as amended, or the securities laws of any state of the United States, and may not
be offered or sold in the United States except in a transaction exempt from, or not subject to, those registration requirements.
Not financial product advice
This presentation does not constitute financialproduct, investment, legal or tax advice and does not take into account the investment objectives, financialsituation or
needs of any person. Recipients should make their own assessment and seek independent professionaladvice before making any investment decision.
Forward-looking statements
This presentation contains forward-lookingstatements regarding the Company and its projects. Forward-lookingstatements may in some cases be identified by
terminology such as “may”, “will”, “could”, “should”, “expect”, “plan”, “intend”, “anticipate”, “believe”, “estimate”, “predict”, “potential” or “continue”, the negative of
such terms, or other comparable terminology. These forward-lookingstatements are only predictions. Actual events or results may differ materially, and a number of
factors may cause the Company’s actual results to differ materially from any such statement. Such factors include, among others, general market conditions, exploration
results, gold prices, the availability of funding, permitting and regulatory approvals, title and tenure matters, operational and contractor performance, changes in laws and
regulations, and such other factors as may be relevant from time to time.
Forward-lookingstatements include, but are not limited to, statements concerningthe Company’s planned explorationand development program(s). These statements
are based on various assumptions made by the Company. Those assumptions are subject to factors which are beyond the Company’scontrol and which involveknown
and unknownrisks, uncertainties and other factors that may cause actual results, performanceor achievements to be materially different from any future results,
performance or achievements expressed or implied by the forward-lookingstatements.
Neither the Company, its officers nor any other person gives any warranty, representation, assurance or guarantee that the events or other matters expressed or implied in
this presentation (including the forward-looking statements) will actually occur. Actual values, results or events may be materially different to those expressed or implied in
this presentation. Given these uncertainties, recipients are cautioned not to place reliance on forward-lookingstatements. Any forward-looking statement in this
presentation is given as at the date of this presentation. The Company does not undertake any obligation to update or revise any informationor any of the forward-looking
statements in this presentation, or any changes in events, conditionsor circumstances on which any such forward-looking statement is based. The key risks set out (non-
exhaustively) in this presentation highlight factors identified by the Company which may cause actual results to differ from any forward-lookinginformation, or which may
otherwise have a material detrimental impact on the Company and its business.
Cautionary Statement – Visual Mineralisation
Visual estimates of mineral abundance should never be considered a proxy or substitute for laboratory analyses where concentrationsor grades are the factor of principal
economic interest. Visual estimates also potentially provide no information regardingimpurities or deleterious physical properties relevant to valuations. Assay results for
the PFR2014_06 re-sampling are pending and will be reported to the market once received.
Limitation of Liability
The information contained in this presentation has been prepared in good faith by the Company. However, no guarantee, representation or warranty, express or implied, is
or will be made by any person (including the Company and its affiliates and their directors, officers, employees, associates, advisers and agents) as to the accuracy,
reliability, correctness, completeness or adequacy of any statements, estimates, opinions, conclusionsor other information contained in this presentation. To the
maximum extent permitted by law, the Company and the Limited Parties each expressly disclaim any and all liability, including, without limitation, any liability arising out of
fault or negligence, for any loss arising from the use of or reliance on information contained in this presentation. This includes representations or warranties, or matters
relating to the accuracy or completeness of the information, statements, opinions, forecasts, reports or other matters, express or implied, contained in, arising out of or
derived from, or omitted from, this presentation, including, without limitation, any financialinformation, any estimates or projections and any other financial information
derived from them.
Statements in this presentation are made only as of the date of this presentation unless otherwise stated, and the information in thispresentation remains subject to
change without notice. No responsibility or liability is assumed by the Companyor any of its affiliates for updating any informationin this presentation, or for informingany
recipient of any new or more accurate information, or of any errors or mis-descriptionsof which the Company or any of its affiliates or advisers may become aware.
Competent Person Statement
The information in thispresentation that relates to ExplorationResults for the Idaho Gold Project is based on, and fairly represents, informationand supporting
documentation compiled by Mr Edward Keys, MAIG. Mr Keys is a Member of the Australian Institute of Geoscientists (AIG). He has sufficient experience relevant to the style
of mineralisation and type of deposit under consideration, and to the activity he is undertaking, to qualify as a Competent Person as defined in the 2012 Edition of the
“Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (JORC Code 2012). Mr Keys is a full-time employee of the Company in the
positionof Chief Executive Officer and holds options in the Company. Mr Keys has provided written consent to the inclusion of the ExplorationResults in the form and
context in which they appear.
Previously Reported Information
The information in thispresentation that relates to previously reported ExplorationResults is extracted from the following documents, available at www.asx.com.au. This
includes historicalexplorationresults for the Friday Gold Project first published by previous operators on the TorontoStock Exchange (TSX).
• Prospectus dated 17 June 2026
• “Coarse Visible Gold Identified in Review of Historical Core at Friday Gold Project”, 14 September 2026
• “Visible Gold in Maiden Friday Drill Hole”, 17 September 2026
• “Maiden hole complete with additional visible gold”, 6 October 2026
• “Maiden Friday hole hits 290m at 2.8g/t mineralised intersection, and extends high grade zones ~170m below historicaldrilling”, 27 October 2026
The Company confirmsthat it is not aware of any new information or data that materially affects the informationincluded in the original market announcements. It also
confirmsthat the form and context in which the Competent Person’s findingsare presented have not been materially modified from the originalmarket announcements.
Foreign Estimate – Cautionary Statement
The foreign estimate for the Friday Gold Project referred to in this presentation is not reported in accordance with the JORC Code. A Competent Person has not done
sufficient work to classify the foreign estimate as mineral resources or ore reserves in accordance with the JORC Code. It is uncertain whether, followingevaluation and/or
further explorationwork, the foreignestimate will be able to be reported as mineral resources or ore reserves in accordance with the JORC Code.
The foreign estimate was first reported in the Company’s Prospectus dated 17 June 2026, which includes the information requiredby ASX Listing Rule 5.12. The Company
confirmsthat:
• it is not in possession of anynew information or data relating to the foreign estimate that materially impacts the reliability of the estimate or the Company’s ability to
verify the foreignestimate as mineral resources in accordance with the JORC Code; and
• the supporting informationprovided in the Prospectus continues to apply and has not materially changed.
Reporting standards outside Australia
The ASX Listing Rules require the reporting of Exploration Results, Mineral Resources and Ore Reserves in Australia to comply with the JORC Code. Investors outside
Australia should note that the JORC Code may differ from the reporting requirements of other countries. Informationin this presentation may not be comparable to similar
informationmade public by companies subject to the reporting and disclosure requirements of other jurisdictions. The Companydoes not currently have any Mineral
Resources or Ore Reserves reported in accordance with the JORC Code.
This presentation has been authorised for release by the Board of Elk Range Mining Limited.
High-Grade Gold Project in Idaho
3
High-grade gold system with existing mining infrastructure and significant exploration upside.
The Idaho Gold Project (“IGP”) contains some meaningful
gold deposits with significant exploration potential and
resource growth
Current exploration activity is centred on the brownfields
Friday Gold Mine (“Friday”)
Friday is an existing permitted underground mine which
produced at ~5-6g/t and contains existing decline
development to the top of the orebody
The Orogrande processing plant was used to process ore
from Friday as recently as 2021
We are focused on systematic exploration and unlocking
an underexplored region
Significant opportunity for consolidation and growth via
M&A
Over US$40m invested in IGP by prior owners
Our Strategy
Previous owners of these assets have progressed development on a small-scale basis
There has been little focused exploration for ~20 years
The region hasn’t seen any substantial consolidation– M&A is a key part of our strategy
Elk Range intends to:
Take a big-picture view of these assets and the region
Expedite the conversion of historical data and resources into JORC
Apply modern exploration techniques for ongoing exploration
Prioritise aggressive drilling to build meaningful resources
Focus on areas of known high-grade mineralisation
Target ongoing land acquisitions to consolidate stranded deposits
Use Australian hub-and-spoke operating methodologies
4
We plan to take a modern and Australian approach to asset development in this region
Source: Elk Range Commences Drilling at Friday Gold Mine, (August 20, 2026
(ELK:ASX Release)
Experienced Board & Management Team
5
Extensive experience in all aspects of gold exploration, development and mining
Prior experience in operating and project execution in the US
Proven track record of delivery across multiple businesses
Existing US site management running active care & maintenance
Mr Campbell Baird
Non-Executive Chairman
Campbell Baird is a mining engineer who
has been part of the Australian and
global mining industry for more than 25
years and has deep operational and
corporate experience across the
resources sector.
He has worked internationally on
projects including Oyu Tolgoi (Mongolia),
Kylylahti (Finland), and with the Iron Ore
Company of Canada.
As Managing Director of Focus Minerals,
he led growth in annual gold production
from 5,000 ounces to 175,000 ounces.
Mr Baird is a Council Member and
Treasurer of AMEC and holds
engineering and finance qualifications
from UNSW and Curtin University.
Mr Rafael Moreno
Non-Executive Director
Rafael Moreno is a Chartered
Professional Engineer and operational
executive with more than 20 years’
experience across the mining and
petrochemical industries throughout
Australia, Asia, Europe and the
Americas.
He has led major international project
execution teams, including involvement
in the Rincon Lithium, Santos Barossa
and INPEX Ichthys projects, and is
currently Managing Director of Viridis
Mining and Minerals.
Mr Moreno holds engineering and
applied chemistry degrees from Curtin
University.
Dr Frazer Tabeart
Non-Executive Director
Frazer Tabeart is a geologist with over 30
years’ experience across exploration and
corporate roles spanning gold, copper,
uranium, nickel and coal projects
globally.
He was Principal Geoscientist at
Western Mining Corporation for 16 years
and is currently Managing Director of
Alma Metals. He has been involved in
the discovery and advancement of
multiple mineral projects across
Australia and Africa.
Dr Tabeart holds a PhD from the Royal
School of Mines in London and is a
member of both the Australian Institute
of Geoscientists and the Society of
Economic Geologists.
Ms Leanne Kite
Executive Director & CFO
Leanne Kite is a Chartered Accountant with
more than 20 years’ experience across the
resources, energy and biotech sectors, with
expertise spanning finance, capital
markets, investor relations and corporate
governance.
Ms Kite acts as Chief Financial Officer and
Company Secretary for Elk Range.
She most recently led investor relations for
Liontown (a ~A$6bn lithium producer) and
previously spent 13 years at Woodside
Energy in senior finance and strategy roles.
She currently serves as a Non-Executive
Director of Patrys Limited (ASX:PAB) and
holds governance and company secretarial
qualifications.
Mr Edward Keys
Chief Executive Officer
Edward Keys is a geologist with 20 years’
international experience across exploration
management, resource growth and
operational leadership within the Australian
and North American mining sectors.
He previously held senior exploration
leadership roles with Brightstar Resources
and Prodigy Gold, contributing to significant
resource growth and large-scale gold and
critical minerals exploration programs.
Mr Keys holds a Bachelor of Science in
Earth Science (Geology) with postgraduate
studies in Geographic Information Systems
(GIS), both from the University of Calgary.
The Idaho Gold Project
Historic gold project with limited exploration
6
Idaho: A Premier Jurisdiction for Mining
7
A proven mining jurisdiction with established infrastructure, a skilled workforce and a supportive permitting framework.
Source: Mine Idaho, Idaho Mining Association, August 2023
Tier 1 Jurisdiction: One of the most
attractive mining jurisdictions in the US
Sensible Permitting: Clear and
predictable permitting process with
federal and state support
Skilled Workforce: Deep pool of
experienced and highly skilled mining
professionals
Stable Regulation: Transparent
regulations and strong respect for
private property rights
Long Mining History: Rich mining
heritage with a track record of
successful exploration and production
Major Operations: Idaho hosts a
number of producing mines and
advanced development projects
• September 2026: entered into a
JV to earn up to 70% in Elk City
and Muldoon Projects from
Scout Discoveries.
• Spending up to US$60m on
exploration across projects.
• Additional US$14.8m
investment in Scout
Discoveries.
• Located in central Idaho's
historic Stibnite Mining District.
• 4.8Moz Au reserve + As credits.
• 463kozpa production yrs1-4
• AISC US$489/oz yrs 1-4
• 15yr LOM
• Black Pine Project in
Southeastern Idaho
• 4.9Moz gold reserve.
• 202kozpa production yrs1-5
• 2.84Moz produced 16yr LOM
• US$1,566/oz AISC (LOM avg)
Idaho Gold Project
“The Orogrande Shear Zone is a
district scale opportunity with
numerous gold deposits and
significant room for further
discovery, plus strong potential
for district consolidation
through M&A and organic
growth.”
8
Situated on the prolific Orogrande Shear Zone in Idaho
Friday Gold Mine
• Prior mining activities were based
on foreign estimates of known
underground resources, poorly
defined.
• Little or no modern exploration,
and only previously progressed on
a small-scale basis.
• High-grade plunging shoots with
strong potential for down-dip
extension and new shoot
discovery.
• Best intersections:
• 112.78m @ 5.22 g/t Au* (uncut)
• 54.1m @ 5.62 g/t Au
Buffalo Gulch Deposit
• Known surface oxide
mineralisation.
• Significant along-strike potential
not yet tested.
• Significant potential for gold
within sulphide mineralisation
in fault wedge below oxide zone.
Deadwood Deposit
• Known surface oxide
mineralisation.
• Potential for deeper sulphide
mineralisation not tested to date.
* interval includes 2.5 ft at
133g/t Au and 2.5 ft at 201 g/t Au
Agnico Eagle: US$60M investment in Elk City Region
AGNICO EAGLE – INVESTING NEXT TO ELK RANGE
• Agnico Eagle Mines Limited (“Agnico Eagle”) has invested
US$14.8M into unlisted Scout Discoveries Corp (“Scout”) to
acquire a 14.9% stake as part of a US$25M private placement
(also cornerstoned by the Electrum Group).
• Agnico Eagle also agreed an earn-in for Scout’s Elk City projects
whereby it can earn up to a 70% interest by funding US$60M
over eight years (US$20M over five years for 51%, plus US$40M
over three years to reach 70%).
• Scout Discoveries will act as the operator during the earn-in
periods, via its internal drilling division, Scout Drilling LLC.
• Initial programs across the projects total ~US$9.4M through the
end of 2027 and “drill rigs are already turning”.
INCREASED STRATEGIC IMPORTANCE OF ELK RANGE TENURE
• The Agnico Eagle / Scout JV area is immediately abutting and
adjacent to the tenure of Elk Range.
• This meaningful investment significantly changes the strategic
relevance and value of ELK’s land position.
• CEO and MD of Scout Discoveries, Curtis Johnson, noted that
when Scout began exploring in Idaho eight years prior, it did so
under the firm conviction that the Elk City region hosted district-
scale mineral systems, and that this deal validated that view.
Elk Range’s advantage:
Friday is the largest high-
grade deposit identified in
the region so far – important
for blending of ore feed.
All ELK projects have
existing foreign mineral
resources for us to grow
and convert to JORC.
ELK owns the only
processing plant in the Elk
City region (fully permitted).
US$60m earn-in
Elk City
Baner
Project
Orogrande
Processing
Plant
Buffalo
Gulch
Deadwood
Friday
Ericskson
Ridge
South
Orogrande
Orogrande
Shear Zone
Friday Gold Project
Significant source of high-grade underground ore
Friday Gold Mine: A Proven High-Grade Gold System
Fully permitted underground gold mine and processing facility located 15km
southwest of Elk City, Idaho
Situated within the prolific Orogrande Shear Zone, a historically productive
gold district
Extensive historical drilling database across patented and unpatented leased
mining claims
Existing underground development over multiple levels, with small -scale
mining commencing in 2020, mined grades ran at ~5-6g/t Au
Ore processed through the nearby 135tpdOrogrande Processing Facility
during 2020–2021
Placed on care and maintenance in February 2022 following COVID -related
supply chain disruptions
Experienced local team retained, providing continuity in permitting,
maintenance and operations
11
Existing underground mine, existing infrastructure and a high-grade gold system with significant exploration upside.
Portal at Friday
Underground Workings at Friday
Limited modern exploration undertaken previously
Friday System & the High-Grade Shoot
12
Drill assay highlights show a large system and high-grade plunging shoot, with potential for repetition
PFR2011_10
4.9m @ 3.27 g/t Au
PFR2011_08
25.6m @ 1.51 g/t Au
PFR2010_17
18.6m @ 1.58 g/t Au
45.7m @ 1.25 g/t Au
PZ052
12.2m @ 2.78 g/t Au
and 18.3m @ 2.46 g/t Au
PFR2011_18
6.4m @ 2.46 g/t Au
BFD-32
37.4m @ 3.53 g/t Au
PFR2014_06
112.78m @ 5.22 g/t Au
incl 7.8m @ 25.61 g/t Au
and 5.3m @ 26.54 g/t Au
PFR2013_01
54.1m @ 5.62 g/t Au
incl 14.5m @ 10.86 g/t Au
PFR2010_21
19.8m @ 11.84 g/t Au
and 15.5m @ 2.44 g/t Au
and 26.5m @ 3.21 g/t Au
and 8.2m @ 2.93 g/t Au
PFR2010_23
134.3m @ 1.47 g/t Au
incl 48.1m @ 2.42 g/t Au
PFR2013_02
146.9m @ 1.60 g/t Au
incl 37.9m @ 2.34 g/t Au
and 35.8m @ 1.95 g/t Au
PFR2009_10
31.7m @ 7.80 g/t Au
and 14.6m @ 2.47 g/t Au
Data Confirms Scale Potential at Friday
Since 2010 there has been extensive geochemical soil
sampling and district scale geophysical surveys across
the three properties.
Surface geochemical data and drilling along a 3km trend
demonstrates that Friday is a large gold system with
significant upside
However, the previous owners did not have the focus or
funding to use this as the basis for exploration outside
the known resource.
Current strike of approximately 1.0km remains open
along strike in both directions
Elk Range Mining has the rights to underground mineral
mineralisation at an average grade of 2g/t Au or higher
under the Friday Mine Lease which forms part of the
acquisition of the Idaho Gold Project
Prior mining at Friday graded on average ~5-6g/t in prior
mining operations
13
Despite poor levels of recent data, soil sampling and mapping confirms a large-scale gold system is present
5km
PETSITE
Elk Range’s Maiden Drilling Programme at Friday
14
Drilling has commenced and the first hole is complete – 290.3m @ 2.8 g/t Au from 18.7m
• Drilling commenced in early August
and is currently underway
• Phase 1 Programme at Friday has
three main objectives:
1. Confirm existing high-grade
mineralisation
2. Infill resource definition
3. Extend resource depth and
extensions
• Total of 8 holes planned for 2,850m
(Phase 1 only)
• An additional two holes are reserved
pending initial outcomes
• Elk Range to investigate the use of
data from prior operators to
accelerate a JORC estimate
First Hole returns 290.3m @ 2.8g/t from 18.7m
Total mineralised envelope of 290.3m @
2.8g/t from 18.7m demonstrates a large
high-grade system and comprises
multiple significant intersections,
including:
o 89.6m @ 5.5 g/t Au from 76.6m (~490
gram-metres, downhole),
including 37.1m @ 8.3 g/t Au
from 129.1m.
o 11.3m @ 21.4g/t from 137.2m.
o 12.7m @ 4.5 g/t Au from 177.2m,
including 10.0m @ 5.5 g/t Au.
o 51.8m @ 2.6 g/t Au from 216.4m,
including 22.4m @ 5.1 g/t Au
from 228.0m.
All within 290.3m @ 2.8 g/t Au from 18.7m
(~820 gram-metres, downhole)
Drilling is continuing on the second pad
where 26FRD002-4 are positioned.
Fully funded for ongoing drilling following
recent IPO.
15
Visible gold returned assays up to 0.3m @ 268.4 g/t Au from 122.38m
Visible gold in multiple locations
Notes:
• 233.8m (top) 122.45m - 122.55m (bottom) (767’ & 401.74–402.07ft) downhole.
• Ruler divisions shown in the photographs are millimetres.
• Red markings were applied during geological logging to identify visible-gold.
Sources: “Visible Gold in Maiden Friday Drill Hole”, Sept 17, 2026 (ELK:ASX Release)
“Maiden hole complete with additional visible gold”, Oct 8, 2026 (ELK:ASX Release)
“Maiden Friday Hole Hits 290m @ 2.8g/t incl 89.6m @ 5.5g/t”, Oct 27, 2026 (ELK: ASX Release)
PFR2009-11
73.5m @ 2.94 g/t Au
from 266.1m
incl 17.2m @ 10.57 g/t
from 277.40m
PFR2014_06
112.78m @ 5.22 g/t Au
from 24.38m
incl 5.3m @ 26.54 g/t Au
from 131.86m
26FRD001
290.26m @ 2.8 g/t Au
from 18.65m
incl 89.55m @ 5.5g/t
from 76.63m
Review of Historical Drilling Data
Elk Range will be using modern exploration, analytical and mining techniques – significant upside potential
Source: Coarse Visible Gold Identified in Review of Historical Core at Friday Gold Project, Sept 14,
2026 (ELK:ASX Release). Scale divisions are 1mm.
• Significant upside potential using modern technology.
• Review and re-logging of historical core underway to
understand the system and structural controls.
• Historical core hasn’t been sampled using modern analytical
techniques. Applying modern sampling is significantly
beneficial to geological understanding.
• Coarse visible gold observed at ~137m downhole in historical
drill core PFR2014_06, within the interval historically reported
by a previous operator as 5.30m @ 26.54g/t Au from 131.86m
to 137.16m.
• Elk Range has quarter-core sampled the ~113m mineralised
interval for photon assay using ~500g sample charge (as
opposed to 50g historically).
• Potential for historical drilling to undercall gold miner
Share your feedback
Discover