Investor Webinar Presentation
Released
Released
Announcement PDF
MARKET ANNOUNCEMENT
Elk Range Mining Limited (ASX : ELK) | ACN: 684 549 620 | ABN: 39 684 549 620
Unit 11, 12-14 Thelma Street, West Perth, WA 6005 | info@elkrange.com.au elkrange.com.au
16 October 2026
InvestorWebinarPresentation
Elk Range Mining Limited (ASX: ELK) ("Elk Range" or the "Company") is pleased to provide the attached
investor presentation in connection with its participation in a Sharewise investor webinar.
The presentation provides an overview of the Company's Idaho gold projects, current exploration activities
and strategic priorities.
This announcement has been authorised for release by the Board of Directors of Elk Range Mining Limited.
Enquiries
Investor Relations
Leanne Kite
Executive Director – Elk Range Mining
T: +61 401 438 850 E: leanne@elkrange.com.au
Media Contact
Luke Forrestal
Director – GRA Partners
T: +61 411 479 144 E: luke.forrestal@omc.com
Follow Elk Range Mining on:
About Elk Range Mining
Elk Range Mining Limited is an Australian-listed gold exploration and development company focused on
advancing a portfolio of projects in Idaho, USA. The Company's assets include the Friday Gold Mine, the
Orogrande Processing Plant and the Buffalo Gulch and Deadwood Projects, providing exposure to both
established infrastructure and significant exploration upside.
Important Information
This announcement contains forward-looking statements which are identified by words such as "may",
"could", "believes", "estimates", "expects", "anticipates", "intends", "plans" and similar expressions. Forward-
lookingstatementsinthisannouncementinclude,butarenotlimitedto,statementsregardingtheCompany's
exploration strategy, planned drilling programme, permitting activities, project advancement and other future
events or expectations.
These statements are based on the Company's current expectations, assumptions and beliefs concerning
future events. Forward-looking statements are subject to known and unknown risks, uncertainties and other
factors, many of which are beyond the control of the Company, that may cause actual results, performance
or achievements to differ materially from those expressed or implied in such statements. These risks include,
but are not limited to, exploration results, geological conditions, commodity prices, permitting and regulatory
approvals, funding availability, operational risks, environmental risks and general economic and market
conditions.
Forward-lookingstatementsarenotguaranteesoffutureperformanceandshouldnotberelieduponassuch.
The Company, its Directors and management do not give any assurance that the results, performance or
achievements expressed or implied by the forward-looking statements contained in this announcement will
occur. Except as required by law or the ASX Listing Rules, the Company undertakes no obligation to update or
revise any forward-looking statements, whether as a result of new information, future events or otherwise.
All references to dollars ($) in this announcement are to Australian dollars unless otherwise stated.
A unique gold
opportunity
October 2026 | ASX: ELK
15/10/2026
Investor Presentation
ShareWise Webinar – 16 October 2026
Important Notice
2
Disclaimer
This presentation has been prepared and issued by Elk Range Mining Limited (Elk Range or Company) to provide general information about
the Company on the basis that you agree in favour of the Company, its directors, officers, employees, agents, advisors and consultants
(together, the Limited Parties) to be bound by the terms and conditions detailed in this presentation. The following disclaimers apply to this
presentation and you are therefore advised to read this carefully before reading or making any other use of this presentation or any
information contained in this presentation. The information contained in this presentation is summary information only and is given in good
faith. The information in this presentation is general in nature and does not purport to be accurate nor complete, nor does it contain all of the
information that an investor may require in evaluating a possible investment in the Company, nor does it contain all the information which
would be required in a disclosure document or prospectus prepared in accordance with the requirements of the Corporations Act 2001 (Cth)
(Corporations Act) or other legislation. Certain information in this document has been derived from third parties and though the Company
has no reason to believe that it is not accurate, reliable or complete, it has not been independently audited or verified by the Company. It has
been prepared by the Company with due care but no representation or warranty, express or implied, is provided in relation to the accuracy,
reliability, fairness or completeness of the information, opinions or conclusions in this presentation by the Company or any other party
involved in its preparation, except as required by law.
This presentation should be read in conjunction with the Company’s prospectus dated 17 June 2026, the supplementary prospectus dated 25
June 2026 and the second supplementary prospectus dated 31 July 2026 (Second Supplementary Prospectus) (collectively, the
Prospectus) and other periodic and continuous disclosure announcements. All amounts are in Australian dollars unless stated otherwise.
Forward looking statements
This presentation may contain forward-looking statements regarding the Company and its projects. Forward-looking statements may in some
cases be identified by terminology such as “may”, “will”, “could”, “should”, “expect”, “plan”, “intend”, “anticipate”, “believe”, “estimate”,
“predict”, “potential” or “continue”, the negative of such terms or other comparable terminology. These forward-looking statements are only
predictions. Actual events or results may differ materially, and a number of factors may cause our actual results to differ materially from any
such statement. Such factors include among others general market conditions, demand for our products, development in reserves and
resources, unpredictable changes in regulations affecting our markets, market acceptance of products and such other factors that may be
relevant from time to time.
Forward-looking statements include, but are not limited to, statements concerning the Company's planned exploration and development
program(s) and any financial forecast information. These statements are based on various assumptions made by the Company. Such
assumptions are subject to factors which are beyond our control, and which involve known and unknown risks, uncertainties and other factors
which may cause our actual results, performance or achievements to be materially different from any future results, performances or
achievements expressed or implied by the forward-looking statements.
Neither the Company, its officers nor any other person gives any warranty, representation, assurance or guarantee that the events or other
matters expressed or implied in this presentation (including the forward-looking statements) will actually occur. Actual values, results or
events may be materially different to those expressed or implied in this presentation. Given these uncertainties, recipients are cautioned not
to place reliance on forward-looking statements. Any forward-looking statement in this presentation is given as at the date of this
presentation. The Company does not undertake any obligation to update or revise any information or any of the forward-looking statements in
this presentation or any changes in events, conditions or circumstances on which any such forward-looking statement is based. Risk factors
which are set out (non-exhaustively) in this presentation highlight key factors identified by the Company which may cause actual results to
differ any forward-looking information or may otherwise have material detrimental impacts on the Company and its business.
Cautionary Statement – Visual Mineralisation:
Visual estimates of mineral abundance should never be considered a proxy or substitute for laboratory analyses where concentrations or
grades are the factor of principal economic interest. Visual estimates also potentially provide no information regarding impurities or
deleterious physical properties relevant to valuations.
Limitation of Liability
The information contained in this presentation has been prepared in good faith by the Company; however, no guarantee representation or
warranty expressed or implied is or will be made by any person (including the Company and its affiliates and their directors, officers,
employees, associates, advisers and Agents) as to the accuracy, reliability, correctness, completeness or adequacy of any statements,
estimates, options, conclusions or other information contained in this presentation. To the maximum extent permitted by law, the Company
and the Limited Parties each expressly disclaims any and all liability, including, without limitation, any liability arising out of fault or negligence,
for any loss arising from the use of or reliance on information contained in this presentation including representations or warranties or in
relation to the accuracy or completeness of the information, statements, opinions, forecasts, reports or other matters, express or implied,
contained in, arising out of or derived from, or for omissions from, this presentation including, without limitation, any financial information, any
estimates or projections and any other financial information derived therefrom.
Statements in this presentation are made only as of the date of this presentation unless otherwise stated and the information in this
presentation remains subject to change without notice. No responsibility or liability is assumed by the Company or any of its affiliates for
updating any information in this presentation or to inform any recipient of any new or more accurate information or any errors or mis-
descriptions of which the Company and any of its affiliates or advisers may become aware.
Competent Person Statement
The information in this presentation which relates to previously announced exploration results is derived from exploration results first released
by the Company in the Prospectus on 17 June 2026 with subsequent ELK Range ASX announcement(s) (September 14 & 17, 2026) outlining
historical results first published by previous operators of the Friday Gold project on the Toronto Stock Exchange (TSX). The Company
confirms that it is not aware of any new information or data that materially affects the information contained in the Prospectus and or
subsequent ELK Range ASX releases and all material assumptions underpinning the exploration results continue to apply and have not
materially changed. The Company confirms that the form and context in which the Competent Person’s findings are presented have not been
materially modified from the Prospectus and subsequent ASX press releases by Elk Range Mining.
The information presented here relating to exploration of the Idaho Gold Project is based on information compiled by Mr Edward Keys, MAIG.
Mr Keys is a Member of the Australasian Institute of Geoscientists (AIG) and has sufficient experience relevant to the style of mineralisation
and type of deposit under consideration and to the activity he is undertaking to qualify as a “Competent Person” as that term is defined in the
2012 Edition of the “Australasian Code of Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code 2012)”. Mr
Keys is a full-time employee of the Company in the position of Chief Executive Officer and has provided written consent approving the
inclusion of the Exploration Results in the form and context in which they appear.
JORC Code differs from reporting requirements in other countries: It is a requirement of the ASX Listing Rules that the reporting of ore
reserves and mineral resources in Australia comply with the JORC Code. Investors outside Australia should note that while mineral resource
estimates of the Company in this document comply with the JORC Code, they may not comply with the relevant guidelines in other countries.
Information contained in this presentation describing mineral deposits may not be comparable to similar information made public by
companies subject to the reporting and disclosure requirements of other countries. You should not assume that quantities reported as
“resources” in this presentation will be converted to reserves under the JORC Code or any other reporting regime or that the Company will be
able to legally and economically extract them.
High-Grade Gold Project in Idaho
3
High-grade gold system with existing mining infrastructure and significant exploration upside.
The Idaho Gold Project (“IGP”) contains some meaningful
gold deposits with significant exploration potential and
resource growth
Current exploration activity is centred on the brownfields
Friday Gold Mine (“Friday”)
Friday is an existing permitted underground mine which
produced at ~5-6g/t and contains existing decline
development to the top of the orebody
The Orogrande processing plant was used to process ore
from Friday as recently as 2021
We are focused on systematic exploration and unlocking
an underexplored region
Significant opportunity for consolidation and growth via
M&A
Over US$40m invested in IGP by prior owners
Our Strategy
Previous owners of these assets have progressed development on a small-scale basis
There has been little focused exploration for ~20 years
The region hasn’t seen any substantial consolidation– M&A is a key part of our strategy
Elk Range intends to:
Take a big-picture view of these assets and the region
Expedite the conversion of historical data and resources into JORC
Apply modern exploration techniques for ongoing exploration
Prioritise aggressive drilling to build meaningful resources
Focus on areas of known high-grade mineralisation
Target ongoing land acquisitions to consolidate stranded deposits
Use Australian hub-and-spoke operating methodologies
4
We plan to take a modern and Australian approach to asset development in this region
Source: Elk Range Commences Drilling at Friday Gold Mine, (August 20, 2026
(ELK:ASX Release)
Experienced Board & Management Team
5
Extensive experience in all aspects of gold exploration, development and mining
Prior experience in operating and project execution in the US
Proven track record of delivery across multiple businesses
Existing US site management running active care & maintenance
Mr Campbell Baird
Non-Executive Chairman
Campbell Baird is a mining engineer who
has been part of the Australian and
global mining industry for more than 25
years and has deep operational and
corporate experience across the
resources sector.
He has worked internationally on
projects including Oyu Tolgoi (Mongolia),
Kylylahti (Finland), and with the Iron Ore
Company of Canada.
As Managing Director of Focus Minerals,
he led growth in annual gold production
from 5,000 ounces to 175,000 ounces.
Mr Baird is a Council Member and
Treasurer of AMEC and holds
engineering and finance qualifications
from UNSW and Curtin University.
Mr Rafael Moreno
Non-Executive Director
Rafael Moreno is a Chartered
Professional Engineer and operational
executive with more than 20 years’
experience across the mining and
petrochemical industries throughout
Australia, Asia, Europe and the
Americas.
He has led major international project
execution teams, including involvement
in the Rincon Lithium, Santos Barossa
and INPEX Ichthys projects, and is
currently Managing Director of Viridis
Mining and Minerals.
Mr Moreno holds engineering and
applied chemistry degrees from Curtin
University.
Dr Frazer Tabeart
Non-Executive Director
Frazer Tabeart is a geologist with over 30
years’ experience across exploration and
corporate roles spanning gold, copper,
uranium, nickel and coal projects
globally.
He was Principal Geoscientist at
Western Mining Corporation for 16 years
and is currently Managing Director of
Alma Metals. He has been involved in
the discovery and advancement of
multiple mineral projects across
Australia and Africa.
Dr Tabeart holds a PhD from the Royal
School of Mines in London and is a
member of both the Australian Institute
of Geoscientists and the Society of
Economic Geologists.
Ms Leanne Kite
Executive Director & CFO
Leanne Kite is a Chartered Accountant with
more than 20 years’ experience across the
resources, energy and biotech sectors, with
expertise spanning finance, capital
markets, investor relations and corporate
governance.
Ms Kite acts as Chief Financial Officer and
Company Secretary for Elk Range.
She most recently led investor relations for
Liontown (a ~A$6bn lithium producer) and
previously spent 13 years at Woodside
Energy in senior finance and strategy roles.
She currently serves as a Non-Executive
Director of Patrys Limited (ASX:PAB) and
holds governance and company secretarial
qualifications.
Mr Edward Keys
Chief Executive Officer
Edward Keys is a geologist with 20 years’
international experience across exploration
management, resource growth and
operational leadership within the Australian
and North American mining sectors.
He previously held senior exploration
leadership roles with Brightstar Resources
and Prodigy Gold, contributing to significant
resource growth and large-scale gold and
critical minerals exploration programs.
Mr Keys holds a Bachelor of Science in
Earth Science (Geology) with postgraduate
studies in Geographic Information Systems
(GIS), both from the University of Calgary.
The Idaho Gold Project
Historic gold project with limited exploration
6
Idaho: A Premier Jurisdiction for Mining
7
A proven mining jurisdiction with established infrastructure, a skilled workforce and a supportive permitting framework.
Source: Mine Idaho, Idaho Mining Association, August 2023
Tier 1 Jurisdiction: One of the most
attractive mining jurisdictions in the US
Sensible Permitting: Clear and
predictable permitting process with
federal and state support
Skilled Workforce: Deep pool of
experienced and highly skilled mining
professionals
Stable Regulation: Transparent
regulations and strong respect for
private property rights
Long Mining History: Rich mining
heritage with a track record of
successful exploration and production
Major Operations: Idaho hosts a
number of producing mines and
advanced development projects
• September 2026: entered into a
JV to earn up to 70% in Elk City
and Muldoon Projects from
Scout Discoveries.
• Spending up to US$60m on
exploration across projects.
• Additional US$14.8m
investment in Scout
Discoveries.
• Located in central Idaho's
historic Stibnite Mining District.
• 4.8Moz Au reserve + As credits.
• 463kozpa production yrs1-4
• AISC US$489/oz yrs 1-4
• 15yr LOM
• Black Pine Project in
Southeastern Idaho
• 4.9Moz gold reserve.
• 202kozpa production yrs1-5
• 2.84Moz produced 16yr LOM
• US$1,566/oz AISC (LOM avg)
Idaho Gold Project
“The Orogrande Shear Zone is a
district scale opportunity with
numerous gold deposits and
significant room for further
discovery, plus strong potential
for district consolidation
through M&A and organic
growth.”
8
Situated on the prolific Orogrande Shear Zone in Idaho
Friday Gold Mine
• Prior mining activities were based
on foreign estimates of known
underground resources, poorly
defined.
• Little or no modern exploration,
and only previously progressed on
a small-scale basis.
• High-grade plunging shoots with
strong potential for down-dip
extension and new shoot
discovery.
• Best intersections:
• 112.78m @ 5.22 g/t Au* (uncut)
• 54.1m @ 5.62 g/t Au
Buffalo Gulch Deposit
• Known surface oxide
mineralisation.
• Significant along-strike potential
not yet tested.
• Significant potential for gold
within sulphide mineralisation
in fault wedge below oxide zone.
Deadwood Deposit
• Known surface oxide
mineralisation.
• Potential for deeper sulphide
mineralisation not tested to date.
* interval includes 2.5 ft at
133g/t Au and 2.5 ft at 201 g/t Au
Agnico Eagle: US$60M investment in Elk City Region
AGNICO EAGLE – INVESTING NEXT TO ELK RANGE
• Agnico Eagle Mines Limited (“Agnico Eagle”) has invested
US$14.8M into unlisted Scout Discoveries Corp (“Scout”) to
acquire a 14.9% stake as part of a US$25M private placement
(also cornered by the Electrum Group).
• Agnico Eagle also agreed an earn-in for Scout’s Elk City projects
whereby it can earn up to a 70% interest by funding US$60M
over eight years (US$20M over five years for 51%, plus US$40M
over three years to reach 70%).
• Scout Discoveries will act as the operator during the earn-in
periods, via its internal drilling division, Scout Drilling LLC.
• Initial programs across the projects total ~US$9.4M through the
end of 2027 and “drill rigs are already turning”.
INCREASED STRATEGIC IMPORTANCE OF ELK RANGE TENURE
• The Agnico Eagle / Scout JV area is immediately abutting and
adjacent to the tenure of Elk Range.
• This meaningful investment significantly changes the strategic
relevance and value of ELK’s land position.
• CEO and MD of Scout Discoveries, Curtis Johnson, noted that
when Scout began exploring in Idaho eight years prior, it did so
under the firm conviction that the Elk City region hosted district-
scale mineral systems, and that this deal validated that view.
Elk Range’s advantage:
Friday is the largest high-
grade deposit identified in
the region so far – important
for blending of ore feed.
All ELK projects have
existing foreign mineral
resources for us to grow
and convert to JORC.
ELK owns the only
processing plant in the Elk
City region (fully permitted).
US$60m earn-in
Elk City
Baner
Project
Orogrande
Processing
Plant
Buffalo
Gulch
Deadwood
Friday
Ericskson
Ridge
South
Orogrande
Orogrande
Shear Zone
Friday Gold Project
Significant source of high-grade underground ore
Friday Gold Mine: A Proven High-Grade Gold System
Fully permitted underground gold mine and processing facility located 15km
southwest of Elk City, Idaho
Situated within the prolific Orogrande Shear Zone, a historically productive
gold district
Extensive historical drilling database across patented and unpatented leased
mining claims
Existing underground development over multiple levels, with small -scale
mining commencing in 2020, mined grades ran at ~5-6g/t Au
Ore processed through the nearby 135tpdOrogrande Processing Facility
during 2020–2021
Placed on care and maintenance in February 2022 following COVID -related
supply chain disruptions
Experienced local team retained, providing continuity in permitting,
maintenance and operations
11
Existing underground mine, existing infrastructure and a high-grade gold system with significant exploration upside.
Portal at Friday
Underground Workings at Friday
Limited modern exploration undertaken previously
Friday System & the High-Grade Shoot
12
Drill assay highlights show a large system and high-grade plunging shoot, with potential for repetition
PFR2011_10
4.9m @ 3.27 g/t Au
PFR2011_08
25.6m @ 1.51 g/t Au
PFR2010_17
18.6m @ 1.58 g/t Au
45.7m @ 1.25 g/t Au
PZ052
12.2m @ 2.78 g/t Au
and 18.3m @ 2.46 g/t Au
PFR2011_18
6.4m @ 2.46 g/t Au
BFD-32
37.4m @ 3.53 g/t Au
PFR2014_06
112.78m @ 5.22 g/t Au
incl 7.8m @ 25.61 g/t Au
and 5.3m @ 26.54 g/t Au
PFR2013_01
54.1m @ 5.62 g/t Au
incl 14.5m @ 10.86 g/t Au
PFR2010_21
19.8m @ 11.84 g/t Au
and 15.5m @ 2.44 g/t Au
and 26.5m @ 3.21 g/t Au
and 8.2m @ 2.93 g/t Au
PFR2010_23
134.3m @ 1.47 g/t Au
incl 48.1m @ 2.42 g/t Au
PFR2013_02
146.9m @ 1.60 g/t Au
incl 37.9m @ 2.34 g/t Au
and 35.8m @ 1.95 g/t Au
PFR2009_10
31.7m @ 7.80 g/t Au
and 14.6m @ 2.47 g/t Au
Data Confirms Scale Potential at Friday
Since 2010 there has been extensive geochemical soil
sampling and district scale geophysical surveys across
the three properties.
Surface geochemical data and drilling along a 3km trend
demonstrates that Friday is a large gold system with
significant upside
However, the previous owners did not had the focus or
funding to use this as the basis for exploration outside
the known resource.
Current strike of approximately 1.0km remains open
along strike in both directions
Elk Range Mining has the rights to underground mineral
resources at an average grade of 2g/t Au or higher under
the Friday Mine Lease which forms part of the
acquisition of the Idaho Gold Project
Prior mining at Friday graded on average ~5-6g/t in prior
mining operations
13
Despite poor levels of recent data, soil sampling and mapping confirms a large-scale gold system is present
5km
PETSITE
Elk Range’s Maiden Drilling Programme at Friday
14
Drilling has commenced and the first hole is tracking well, with visible gold in the core
• Drilling commenced in early August
and is currently underway
• Phase 1 Programme at Friday has
three main objectives:
1. Confirm existing high-grade
mineralisation
2. Infill resource definition
3. Extend resource depth and
extensions
• Total of 8 holes planned for 2,850m
(Phase 1 only)
• An additional two holes are reserved
pending initial outcomes
• Elk Range to investigate the use of
data from prior operators to
accelerate a JORC estimate
First Hole Hits Visible Gold
• First hole now complete:
upper portion parallel to
historical drilling with
significant intercept (112.78m
@ 5.22 g/t Au from 24.4m)
• Historical drilling ended in
significant mineralisation
(0.76m @ 133g/t from
136.44m)
• Completed drilling extended
into interpreted mineralised
trend and delivered visible
gold in multiple areas
• Focus on structural controls
• Samples are at the lab with
results pending
15
Visible gold identified in the first hole that Elk Range has drilled into Friday: Assays Pending
Visible gold in multiple locations
Notes:
• 233.8m (top) 122.45m - 122.55m (bottom) (767’ & 401.74–402.07ft) downhole.
• Ruler divisions shown in the photographs are millimetres.
• Red markings were applied during geological logging to identify visible-gold.
Sources: “Visible Gold in Maiden Friday Drill Hole”, Sept 17, 2026 (ELK:ASX Release)
“Maiden hole complete with additional visible gold”, Oct 8, 2026 (ELK:ASX Release)
Review of Historical Drilling Data
Elk Range will be using modern exploration, analytical and mining techniques – significant upside potential
Source: Coarse Visible Gold Identified in Review of Historical Core at Friday Gold Project, Sept 14,
2026 (ELK:ASX Release). Scale divisions are 1mm.
• Significant upside potential using modern technology.
• Review and re-logging of historical core underway to
understand the system and structural controls.
• Historical core hasn’t been sampled using modern analytical
techniques. Applying modern sampling is significantly
beneficial to geological understanding.
• Coarse visible gold observed at ~137m downhole in historical
drill core PFR2014_06, within the interval historically reported
by a previous operator as 5.30m @ 26.54g/t Au from 131.86m
to 137.16m.
• Elk Range has quarter-core sampled the ~113m mineralised
interval for photon assay using ~500g sample charge (as
opposed to 50g historically).
• Potential for historical drilling to undercall gold mineralisation
in a coarse, high-grade gold system.
Resource Infill Drilling Phase
Second planned hole has begun to infill for resource estimation
PFR2009_10
152m @ 3.28 g/t Au PFR2013_01
54.1m @ 5.62 g/t Au
incl 9.14m @ 15.19 g/t Au
Friday Extensional Exploration
18
Limited modern exploration has been undertaken at Friday… Many high-order targets to test with modern exploration
Soil sampling
Soil sampling is very effective
tool for targeting
Large area of very poorly tested
gold in soil anomalism in the
Petsite Stock area, south of
Friday
Northern soil anomaly is also
under drilled – significant
upside potential
Unsampled areas are also
considered prospective –
more soil sampling required to
fully evaluate scale
Magnetic surveys
Aeromagnetic data highlight's
location of mineralisation
along strong magnetic
gradients
Several other areas with
similar gradients that have
never been drill tested
PETSITE
Growth Projects
Buffalo Gulch and Deadwood show prospectivity,
however we will also be aggressive in regional M&A
19
Buffalo Gulch & Deadwood
Buffalo Gulch and Deadwood are located
approximately 2-3km apart, and both sit
within the Orogrande Shear Zone
Buffalo Gulch:
Extensive known surface oxide
mineralisation.
Significant along-strike potential not yet
tested.
Significant potential for gold within
sulphide mineralisation in fault wedge
below the oxide zone.
Deadwood:
Extensive known surface oxide
mineralisation.
Potential for deeper sulphides
mineralisation not tested to date.
20
Two large / lower-grade systems that have been significantly under-explored
Buffalo Gulch Deposit
Buffalo Gulch has historically been progressed on a
small-scale basis with a focus on heap leaching.
Mineralisation from surface, prior drilling only 50-100m
deep, with only 6 holes >100m depth (out of a total of 178
holes).
Mineralisation is controlled by a shear-hosted and
stockwork quartz-pyrite vein system which is mapped by
chargeability.
Chargeability survey and soil sampling show that drilling
has covered less than 50% of the prospective geology –
huge upside
No previous operations, apart from a test pit in the late
1980s when small amount of material was excavated.
Historical drilling is predominantly into oxide zone only,
but several holes below this have confirmed gold
mineralization at depth in the sulphides zone that has not
been followed up.
Significant potential for a wedge of sulphide
mineralisation associated with quartz-sericite-pyrite
alteration (mapped by the chargeability).
21
A large and lower-grade deposit which has great prospectivity for significant resource
Buffalo Gulch Upside
22
Potential for deeper sulphide resources in addition to along-strike oxide mineralisation
OXIDE
MINERALISATION
UNTESTED
SULPHIDE
TARGET
POTENTIAL HIGH GRADE
FEEDER ZONE TARGET
Majority of known mineralisation sits in the oxide zone, with very
little drilling into deeper sulphide zone that is mapped by
chargeability.
Share your feedback
Discover