Maiden Friday Hole Hits 290m @ 2.8g/t incl 89.6m @ 5.5g/t
Released
Released
Announcement PDF
MARKET ANNOUNCEMENT
Elk Range Mining Limited (ASX : ELK) | ACN: 684 549 620 | ABN: 39 684 549 620
Unit 11, 12-14 Thelma Street, West Perth, WA 6005 | info@elkrange.com.au elkrange.com.au
27 October 2026
MaidenFridayholehits290mat2.8g/tmineralised
intersection,andextendshighgradezones~170m
belowhistoricaldrilling
Includes 89.6m @ 5.5g/t, 11.3m @ 21.4g/t and 37.1m at 8.3g/t
Highlights
Maiden hole confirms significant Friday mineralised zone and significantly extends high-
grade gold beyond where historical drilling stopped.
Total mineralised envelope of 290.3m @ 2.8g/t from 18.7m demonstrates a large high-grade
system and comprises multiple significant intersections, including:
o 89.6m @ 5.5 g/t Au from 76.6m (~490 gram-metres, downhole),
including 37.1m @ 8.3 g/t Au from 129.1m;
and 11.3m @ 21.4g/t from 137.2m.
o 12.7m @ 4.5 g/t Au from 177.2m,
including 10.0m @ 5.5 g/t Au.
o 51.8m @ 2.6 g/t Au from 216.4m,
including 22.4m @ 5.1 g/t Au from 228.0m.
Importantly, high-grade mineralisation has been extended a further ~170m, to 309m
downhole beyond the historical paralleled hole, including 11.3m @ 21.4 g/t Au from 137.2m
immediately below that precedent.
Total mineralised envelope of 290.3m @ 2.8g/t equates to ~820 gram-metres (downhole) and
provides substantial structural and geological information to assist ongoing exploration.
Drilling is continuing on the second pad where 26FRD002-4 are positioned.
Fully funded for ongoing drilling following recent IPO.
Elk Range Mining Limited (ASX: ELK) ("Elk Range" or the "Company") is pleased to report that its maiden
diamond drill hole at the Friday Gold Project in Idaho, USA, has demonstrated significant continuous gold
mineralisation along the Friday shear zone. Pleasingly, high-grade gold is demonstrated to continue beyond
the limit of historical drilling.
Drilled along the shear zone to test its continuity, 26FRD001 returned 89.6m @ 5.5 g/t Au from 76.6m,
including 37.1m @ 8.3 g/t Au from 129.1m (downhole).
High grade continues beyond where the historical hole stopped: historical hole PFR2014_06 ended at
137.16m, and 26FRD001 returned 11.3m @ 21.4 g/t Au from that depth. Mineralisation then continues for
a further ~170m, including 12.7m @ 4.5 g/t Au from 177.2m and 51.8m @ 2.6 g/t Au from 216.4m, including
22.4m @ 5.1 g/t Au, all within a broader mineralised interval of 290.3m @ 2.8 g/t Au from 18.7m (see Figure
1).
(Click here to view this announcement in the Elk Range Mining Investor Hub)
Elk Range Mining Limited Page 2 of 17
Chief Executive Officer, Edward Keys, said:
"Every investor looking at an old mine asks the same question: did the gold stop where the drilling stopped?
This hole answers it. The gold carries on for more than 170 metres below where the old hole stopped,
starting with 11 metres at 21 grams per tonne.
"We drilled this hole along the shear zone to test its continuity, and it delivered: gold over 290 metres, with
high-grade zones like 89.6 metres at 5.5 grams per tonne inside it.
"Friday also has existing underground development, on patented ground. Most explorers celebrating a
result like this are starting from a bare hillside. We're starting with infrastructure already in place.
"For the first time at Friday we have oriented core, and it's showing us how the high-grade gold is aligned.
That makes every hole from here smarter than the last. 26FRD001 proved the system. The rest of Phase 1
helps us understand how big it is."
Figure 1: Cross-section A–A' (looking north) showing 26FRD001 assays and historical holes PFR2014_06 and PFR2009_11. Section
displayed on the plan map (Figure 2).
PFR2009-11
73.5m @ 2.94 g/t Au
from 266.1m
incl 17.2m @ 10.57 g/t
from 277.40m
PFR2014_06
112.78m @ 5.22 g/t Au
from 24.38m
incl 5.3m @ 26.54 g/t Au
from 131.86m
26FRD001
290.26m @ 2.8 g/t Au
from 18.65m
incl 89.55m @ 5.5g/t
from 76.63m
Elk Range Mining Limited Page 3 of 17
Maiden hole delivers continuous mineralisation along the Friday shear zone
26FRD001 was drilled to a final depth of 336.8m (1,105ft). It was collared about 8m from historical hole
PFR2014_06 and drilled parallel to it through the historically reported mineralised interval, before
continuing a further 200m beyond the historical end-of-hole into an area of limited previous drilling. All
significant intercepts in 26FRD001 meeting the reporting criteria are reported in Table 1.
Table 1: 26FRD001 significant gold intercepts. 26FRD001 was drilled along the interpreted shear zone;
all intervals are downhole lengths and do not represent true widths, which have not been estimated.
Hole ID From (m) To (m)
Interval
(m)
Au (g/t)
Gram-
metres
Cut Off
Grade Au
g/t
Zone
26FRD001 18.65 308.91 290.26 2.8 820 Min Env*
Broader mineralised
interval
incl. 18.65 71.93 53.28 1.9 100 0.45 Above historical EOH
incl. 24.23 44.20 19.96 2.6 52 1.00
and 52.27 59.44 7.16 4.5 32 1.00
76.63 166.18 89.55 5.5 491 0.45 Straddles historical EOH
incl. 111.71 125.58 13.87 9.7 135 1.00
and 129.08 166.18 37.09 8.3 300 1.00 Straddles historical EOH
incl. 137.16 148.44 11.28 21.4 241 5.00 Below historical EOH
177.18 189.89 12.71 4.5 57 0.45 Below historical EOH
incl. 177.18 187.15 9.97 5.5 55 1.00
incl. 181.69 184.71 3.02 13.4 40 5.00
200.25 207.11 6.86 0.7 5 0.45 Below historical EOH
216.41 268.22 51.82 2.6 135 0.45 Below historical EOH
incl. 227.99 250.39 22.40 5.1 114 1.00
273.10 308.91 35.81 0.8 29 0.45 Below historical EOH
Reporting Criteria:
Minimum intersection 3m downhole length
Maximum internal dilution 3.35m downhole length
Zones of core loss ascribed null value (0 g/t Au)
Intersections reported at various cut-off grades: 0.45g/t Au, 1.00g/t Au and 5.00g/t Au
*Mineralised Envelope extends between first and last assays at 0.45g/t Au and includes all internal dilution (14%)
The hole was designed to:
• validate historical hole PFR2014_06, reported by Premium Exploration Inc. on 7 October 2014 as
112.78m @ 5.22 g/t Au from 24.38m, including 6.55m @ 34.22 g/t Au from 114.00m and 5.30m @
26.54 g/t Au from 131.86m to end-of-hole;
• test whether mineralisation continues below the historical end-of-hole; and
• provide the first oriented modern structural dataset through the Friday system.
26FRD001 intersected the historically reported mineralised zone, continued in mineralisation for a further
~170m below the historical end-of-hole, and delivered the first oriented modern structural data at Friday.
Approximately 96% of the bedrock interval was available for sampling. Significant intercepts are shown in
Table 1.
26FRD001 tests a single section of the Friday system. Historical drilling at Friday totals 386 holes for more
than 44,200m and defined a north–south trending body of mineralisation extending ~430m along strike and
~43–55m across strike (Independent Geologist's Report, Elk Range Prospectus dated 17 June 2026). The
remaining Phase 1 holes are designed to test the system along strike and at depth. The location of
26FRD001 within the Friday trend is shown in Figures 1 to 3. On the 26FRD001 section, historical hole
PFR2009_11 was drilled to 490.12m downhole depth.
Elk Range Mining Limited Page 4 of 17
High grade immediately below the historical hole
Historical hole PFR2014_06 ended at 137.16m (450ft). Immediately below that depth, 26FRD001 remained
in mineralisation, and returned 11.3m @ 21.4 g/t Au from 137.16m, within 37.1m @ 8.3 g/t Au from 129.1m.
This high-grade zone sits in an area of limited historical drilling on this section.
Mineralisation continues ~170m below the historical hole
Below 137.16m, 26FRD001 continued in mineralisation to 308.91m downhole, returning 12.7m @ 4.5 g/t
Au from 177.2m (including 10.0m @ 5.5 g/t Au), 51.8m @ 2.6 g/t Au from 216.4m (including 22.4m @ 5.1 g/t
Au from 228.0m) and 35.8m @ 0.8 g/t Au from 273.1m. Geological logging identified continuous shearing
and hydrothermal alteration throughout the hole, consistent with a persistent mineralised structural
envelope containing gold.
On the same section, historical hole PFR2009_11, drilled by Premium Exploration Inc. from the east,
intersected 73.50m @ 2.94 g/t Au from 266.10m, including 17.20m @ 10.57 g/t Au from 277.40m
(previously reported 17 September 2026).
Visible gold confirmed by assays
The Company previously reported visible gold in 26FRD001 at five depths (ASX announcements dated 17
September and 6 October 2026). Table 2 shows the assay result for each occurrence.
Table 2: Previously reported visible gold in 26FRD001 and corresponding assay intervals.
Depth (m) Visible gold setting Assay interval (m) Au (g/t)
122.45–122.55
Seven grains; deformed quartz-feldspar-
carbonate vein
122.38–122.68 268.4
~124.1
Multiple grains; sericite-silica altered
metasediment
123.75–124.36 5.4
~138.7
Blebs; boudinaged quartz-carbonate vein
(below historical EOH)
138.07–138.99 2.6
~159.9 Blebs; boudinaged quartz-carbonate vein 159.26–160.02 6.1
~233.8 Native gold veinlet >1cm 233.54–233.93 120.0
Note: visible gold logged at ~122.4m, ~124.1m and ~159.9m remains in the retained half core; at ~138.7m visible gold is on the cut
face of the retained core; the retained half core at ~233.8m shows no visible gold. Assays are of the half core submitted to the
laboratory.
Elk Range Mining Limited Page 5 of 17
Image 1: 26FRD001 core trays 33 and 65, with geological descriptions and annotated assays. Tray 65, at approximately 767ft
(233.8m) downhole, shows a visible native gold veinlet extending for more than 1cm (previously reported 6 October 2026). This
interval returned 0.39m @ 120.0 g/t Au.
26FRD001 · Tray T-33 · 392.4 –403.1 ft Au grade: 0–1 g/t 1–3 g/t 3–5 g/t >5 g/t
Row 1 – geological description: Intensely altered (sericite, silica) and ductile deformed schist (metasediment). Minor pyrite as disseminations with affinity to deformation. Shearing and
foliation at low angles to core axis.
Row 2 – geological description: Increased brittle/ductile deformation with notable gouging related to low angle shearing. Quartz carbonate veining with pyrite. Schist as above. Cross
cutting carbonate-bearing veining to pre-existing foliation.
Row 3 – geological description: Reduced ductile/brittle deformation and reduced pyrite disseminations in moderately sheared and pervasively altered schist (sericite/silica)
Row 4 – geological description: Increased ductile/brittle deformation with associated abundant pyrite mineralization. Visible gold within schist adjacent to brittle sheared schist with
affinity to (increased) quarts feldspar carbonate veinlets displaying ductile stretching post-dating earlier deformation. Increased biotite alteration along irregular brittle/ductile shearing.
26FRD001 · Tray T-65 · 762.5 –773.0 ft Au grade: 0–1 g/t 1–3 g/t 3–5 g/t >5 g/t
Row 1 – geological description: Weak, irregular and highly discontinuous quartz-carbonate+sulfide vienletting. Additionally dark greyish alteration with, sericite-silica pervasive. Veinlets
with weak, hazy alteration halos bleaching the rock. Multiple generations of veining evident within this strongly altered and structurally complex zone. Also fracture -filll style vfg
disseminated sulfide in silica found locally.
Row 2 – geological description: Sheared zone with contacts between fingers of Quartz monzonite and muscovite schist. Schist after intrusive displays increasing disseminated pyrite with
depth.
Row 3 – geological description: 1.5cm long by 1mm thick lens of seemingly fracture-controlled, late, brilliant yellow-gold, moderately-crystalline native gold within Muscovite Schist,
green/grey/brown color; well foliated; often leopard-print texture. Pervasive strong to intense silica overprinting pervasive strong sericite.
Row 4 – geological description: Trace to locallized minor quantites of pyrite a disseminations or as hariline to 1mm sized silica-pyrite stringers. Much of the sulfide may be hosted in
gouge within interval as well.
Elk Range Mining Limited Page 6 of 17
Geology and structural controls
Gold is typically hosted in structurally deformed metasediment (micaceous schist) near a sheared quartz
monzonite contact. It is associated with boudinaged quartz-feldspar-carbonate veining, pyrite-bearing
sericite-silica alteration and quartz-healed breccia, consistent with repeated brittle-ductile deformation.
26FRD001 was oriented along the interpreted steeply dipping shear zone to test the continuity, distribution
and structural controls of gold mineralisation, and recovered oriented HQ3 triple-tube core through the
entire hole, giving Friday its first structural dataset tied directly to assayed gold. Structural measurements
are being integrated with the assay results to refine targeting of the remaining Phase 1 holes.
Next steps
Drilling is continuing at Friday on the second pad of the program. 26FRD002 reached ~151m (of a planned
366m) before drilling was paused due to mechanical issues. The rig has moved to 26FRD003 on the same
pad, which is currently at ~125m (of a planned 396m).
Drilling of 26FRD002 will resume once 26FRD003 is complete. Core drilled to date in both holes will be
submitted to Paragon Laboratories in the coming days, with assay results expected approximately four
weeks after delivery to the laboratory (late November).
Follow-up work is designed to test how far the high-grade system extends at depth and along the ~430m of
strike at Friday:
• completion of 26FRD002, an infill and up-dip/southern extension hole about 230m north-east of
26FRD001, and 26FRD003 from the same pad;
• drilling of the remaining Phase 1 holes (~2,850m program), with targeting refined using oriented
structural data from 26FRD001;
• evaluation of contingent holes 26FRD009 and 26FRD010 and potential underground drilling,
based on results; and
• integration of new and historical data towards a maiden JORC-compliant Mineral Resource for
Friday.
PFR2014_06 re-assay. As previously reported, Elk Range re-sampled the historically mineralised interval
in PFR2014_06 for PhotonAssay™ analysis (quarter-core sampling). These samples have been submitted to
the laboratory and results are pending. Elk Range will report the results to the market once received.
Elk Range is fully funded to complete the Phase 1 program following its $10 million IPO.
Elk Range Mining Limited Page 7 of 17
Figure 2: Phase 1 Friday drilling plan showing eight planned surface diamond drill holes for approximately 2,850 metres, with cross-
section trace A–A' through maiden drill hole 26FRD001.
Figure 3: Friday Gold Project plan map showing completed hole 26FRD001, holes in progress 26FRD002 and 26FRD003, remaining
planned Phase 1 holes, historical drill collars, cross-section A–A′ (Figure 1), planned section B–B′ and the foreign resource outline
projected to surface. The foreign estimate referred to in this announcement is not reported in accordance with the JORC Code. A
competent person has not done sufficient work to classify the foreign estimate as mineral resources or ore reserves in accordance
with the JORC Code. It is uncertain that following evaluation and/or further exploration work that the foreign estimate will be able to
be reported as mineral resources or ore reserves in accordance with the JORC Code.
The foreign estimate for the Friday Gold Project was first reported in the Company's Prospectus dated 17 June 2026, which includes
the information required by Listing Rule 5.12. The Company confirms that it is not in possession ofanynew information ordata relating
to the foreign estimate that materially impacts on the reliability of the estimate or the Company's ability to verify the foreign estimate
Elk Range Mining Limited Page 8 of 17
as mineral resources in accordance with the JORC Code. The Company confirms that the supporting information provided in the
Prospectus continues to apply and has not materially changed.
This announcement has been authorised for release by the Board of Directors of Elk Range Mining Limited.
Enquiries
Investor Relations
Leanne Kite
Executive Director
T: +61 401 438 850 E: leanne@elkrange.com.au
Media Contact
Luke Forrestal
Director – GRA Partners
T: +61 411 479 144 E: luke.forrestal@omc.com
Follow Elk Range Mining on:
About Elk Range Mining
Elk Range Mining Limited is an Australian-listed gold exploration and development company focused on
advancing a portfolio of projects in Idaho, USA. The Company's assets include the Friday Gold Mine, the
Orogrande Processing Plant and the Buffalo Gulch and Deadwood Projects, providing exposure to both
established infrastructure and significant exploration upside.
Important Information
This announcement contains forward-looking statements which are identified by words such as "may",
"could", "believes", "estimates", "expects", "anticipates", "intends", "plans" and similar expressions. Forward-
lookingstatementsinthisannouncementinclude,butarenotlimitedto,statementsregardingtheCompany's
exploration strategy, planned drilling program, permitting activities, project advancement and other future
events or expectations.
These statements are based on the Company's current expectations, assumptions and beliefs concerning
future events. Forward-looking statements are subject to known and unknown risks, uncertainties and other
factors, many of which are beyond the control of the Company, that may cause actual results, performance
or achievements to differ materially from those expressed or implied in such statements. These risks include,
but are not limited to, exploration results, geological conditions, commodity prices, permitting and regulatory
approvals, funding availability, operational risks, environmental risks and general economic and market
conditions.
Forward-lookingstatementsarenotguaranteesoffutureperformance and should notberelied uponassuch.
The Company, its Directors and management do not give any assurance that the results, performance or
achievements expressed or implied by the forward-looking statements contained in this announcement will
occur. Except as required by law or the ASX Listing Rules, the Company undertakes no obligation to update or
revise any forward-looking statements, whether as a result of new information, future events or otherwise.
Competent Person Statement - Exploration
The information presented here relating to exploration of the Idaho Gold Project is based on, and fairly
represents, information and supporting documentation compiled by Mr Edward Keys, MAIG. Mr Keys is a
Member of the Australasian Institute of Geoscientists (AIG) and has sufficient experience relevant to the
style of mineralisation and type of deposit under consideration and to the activity he is undertaking to
qualify as a “Competent Person” as that term is defined in the 2012 Edition of the “Australasian Code of
Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code 2012)”. Mr Keys is a full-
time employee of the Company in the position of Chief Executive Officer. Mr Keys holds options in the
Company and has provided written consent approving the inclusion of the Exploration Results in the form
and context in which they appear.
Elk Range Mining Limited Page 9 of 17
Previously Reported Information
The information in this announcement that relates to previously reported Exploration Results, including the
visible gold observed in 26FRD001 and the historical exploration results for the Friday Gold Project, is
extracted from the Company's Prospectus dated 17 June 2026 and ASX announcements dated 14
September 2026, 17 September 2026 and 6 October 2026, which are available at www.asx.com.au. The
Company confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcements, and that the form and context in which the Competent
Person's findings are presented have not been materially modified from the original market
announcements.
All references to dollars ($) in this announcement are to Australian dollars unless otherwise stated.
Elk Range Mining Limited Page 10 of 17
Drill Hole Collar Information
Table 3: Friday Maiden Drilling 2026 Diamond drilling collar information. Holes located on patented
leases at Friday Mine. Grid coordinates shown in NAD83 Idaho West (ftUS).
Hole ID Easting Northing RL (ft) Azimuth Dip
Depth (m),
final/planned
Status
26FRD001 2677761 1471426 4656 88 -63° 336.8
Complete –
assays reported
26FRD002 2678360 1471894 4743 250 -65° 365.76
Paused
(mechanical); to
resume after
26FRD003
26FRD003 2678360 1471894 4743 283 -70° 396.24 In Progress
26FRD004 2678360 1471894 4743 270 -65° 335.28 Planned
26FRD005 2677475 1471690 4575 78 -50° 365.76 Planned
26FRD006 2678417 1472058 4735 270 -70° 441.96 Planned
26FRD007 2678320 1472172 4651 278 -56° 365.76 Planned
26FRD008 2678305 1471278 4741 285 -62° 243.84 Planned
Elk Range Mining Limited Page 11 of 17
APPENDIX 1: JORC CODE, 2012 EDITION TABLE 1
Section 1: Sampling Techniques and Data (Criteria in this section apply to all succeeding sections)
Criteria JORC Code Explanation Commentary
Sampling
techniques
a. Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised industry standard measurement
tools appropriate to the minerals under
investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc).
These examples should not be taken as
limiting the broad meaning of sampling.
b. Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any measurement
tools or systems used.
c. Aspects of the determination of mineralisation
that are Material to the Public Report.
d. In cases where ‘industry standard’ work has
been done this would be relatively simple (eg
‘reverse circulation drilling was used to obtain
1 m samples from which 3 kg was pulverised
to produce a 30 g charge for fire assay’). In
other cases more explanation may be
required, such as where there is coarse gold
that has inherent sampling problems. Unusual
commodities or mineralisation types (eg
submarine nodules) may warrant disclosure of
detailed information.
26FRD001 was drilled using HQ3 triple-tube
diamond core to 336.80 m (1,105 ft). The final
cutting register records 471 numbered physical
core samples covering 1,046.9 ft (319.10 m) of
recovered material; intervals without recoverable
core were not sampled. The logging geologists
selected sample boundaries to honour lithological
and mineralisation changes, marked core and
trays, positioned core for consistent cutting and
photographed the core before cutting. Competent
core was diamond-sawn and the left half, viewed
downhole relative to the bottom-of-hole orientation
line, submitted for assay; the orientation line was
retained on the archive half. Where the orientation
line was absent, geological foliation and observed
fabric were used to maintain a consistent cutting
plane and sampled side through adjacent intervals.
Friable core was divided with a clean chisel to
preserve fines. Sampling was systematic and not
restricted to visible gold. No new PFR2014_06 re-
assay results are reported.
Historical results. Historical results for
PFR2014_06 and other historical holes referred to
in this announcement were reported in the
Company's Prospectus dated 17 June 2026 and
ASX announcement dated 17 September 2026.
They are unchanged.
Drilling
techniques
e. Drill type (eg core, reverse circulation, open-
hole hammer, rotary air blast, auger, Bangka,
sonic, etc) and details (eg core diameter, triple
or standard tube, depth of diamond tails, face-
sampling bit or other type, whether core is
oriented and if so, by what method, etc).
26FRD001 was drilled by Black Cloud Drilling
using a skid-mounted diamond drill rig, producing
HQ3 triple-tube core to 336.80 m (1,105 ft). Core
orientation was undertaken using the Stockholm
Precision Tools CoreMaster system. Downhole
orientation was monitored by Stockholm Precision
Tools GyroMaster gyroscopic survey equipment
using periodic shots, typically at 30 ft and 50 ft
intervals, and an additional continuous in-run/out-
run survey. CoreRetriever continuous survey shots
extend to total depth with both in-run and out-run
surveys completed at the end of hole.
Drill sample
recovery
f. Method of recording and assessing core and
chip sample recoveries and results assessed.
g. Measures taken to maximise sample recovery
and ensure representative nature of the
samples.
h. Whether a relationship exists between sample
recovery and grade and whether sample bias
may have occurred due to preferential
loss/gain of fine/coarse material.
Drill-run recovery and RQD were recorded in the
geotechnical log. For quantifying material available
for assay, the final cutting/sample register is the
governing record: 471 physical samples span
1,046.9 ft (319.10 m), and intervals recorded as
NO SAMPLE or represented by gaps in the
sampled depth sequence total 58.1 ft (17.71 m)
over the 1,105 ft hole. This includes the initial 11 ft
(3.35 m) where surface material was not retained
during collaring activity; within the 11–1,105 ft
sampled-bedrock interval, 47.1 ft (14.36 m) was
unavailable, equivalent to 95.69% sampled core
availability. Shorter drilling runs in
fractured/sheared ground were used to maximise
recovery. Unrecovered intervals were not
submitted for assay and were assigned a nominal
0 g/t Au only for length-weighted intercept
calculations. Potential recovery-related grade bias
must be assessed in context of adjacent assay
grades and logged shearing; the register-derived
availability percentage is not presented as a
conventional drill-run recovery statistic.
Elk Range Mining Limited Page 12 of 17
Criteria JORC Code Explanation Commentary
Logging i. Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies.
j. Whether logging is qualitative or quantitative
in nature. Core (or costean, channel, etc)
photography.
k. The total length and percentage of the
relevant intersections logged.
The entire 1,105 ft hole was geologically and
geotechnically logged, including lithology,
alteration, weathering, shearing, veining, sulphides,
visible gold, core recovery, RQD and oriented
structural observations where reliable. Logging
includes qualitative descriptions and quantitative
measurements as appropriate. Core trays were
depth-marked and photographed before cutting.
Geological contacts, sampling boundaries and
intervals of unavailable core were recorded in the
geological and cutting registers.
Sub-sampling
techniques and
sample
preparation
l. If core, whether cut or sawn and whether
quarter, half or all core taken.
m. If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet or
dry.
n. For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
o. Quality control procedures adopted for all sub-
sampling stages to maximise representivity of
samples.
p. Measures taken to ensure that the sampling is
representative of the in situ material collected,
including for instance results for field
duplicate/second-half sampling.
q. Whether sample sizes are appropriate to the
grain size of the material being sampled.
Core was geologically logged, sample boundaries
marked and photographed before cutting. Logging
geologists positioned the core in trays to indicate
the required cut and supplied numbered sample
instructions to the trained core technician.
Competent HQ3 core was cut using a diamond
saw: the left-hand half, referenced to the
orientation line, was consistently submitted for
analysis and the half bearing the orientation line
retained. Where an orientation line was absent,
foliation and other geological fabric were used to
maintain a consistent cutting and sampling side.
Friable or clay-rich core was divided with a clean
chisel to minimise fines loss. Barren rock was cut
through the saw following visible-gold-bearing or
visually similar material as a contamination-control
measure. The sample register records 471 physical
core samples and 64 inserted QA/QC controls. The
signed 11 October 2026 Paragon submittal
specified PREP-PKG for all submitted sample IDs.
Under Paragon's quotation, PREP-PKG comprises
sample inventory and weighing, drying at 100°C,
crushing to 70% passing 10 mesh (approximately 2
mm), riffle splitting 500 g and pulverising to 85%
passing 200 mesh, providing an approximately
400–500 g PhotonAssay charge. The final
laboratory certificate reports the actual
PhotonAssay charge weights. The final certificate
identifies the completed analytical method as PA-
AU02-SPKS. Sample sizes are considered
appropriate for the style of mineralisation. Because
gold at Friday is locally coarse, the larger
PhotonAssay sample mass (~500g) is used to
reduce sampling variability compared with
historically used 50g fire assay. Results are
checked on receipt of assay batches and QAQC
reports produced by the Elk Range database
manager for checking by the geologist.
Duplicate Sampling Protocol
Elk Range Mining employs quarter-core and
coarse-reject duplicate sampling as part of its
QA/QC program to assess sampling and analytical
precision.
Quarter-core duplicates are selected following
receipt of primary assay results to ensure
representative coverage across mineralised
intervals and a range of gold grades. Selected
intervals are re-cut from the retained half core, with
one quarter submitted for duplicate analysis and
the remaining quarter preserved as a permanent
geological archive.
Coarse-reject duplicates are generated through
laboratory re-splitting of selected primary sample
coarse rejects to assess sample preparation and
analytical precision downstream of primary
crushing. Coarse-reject duplicate samples have
been submitted to the laboratory, with assay results
Elk Range Mining Limited Page 13 of 17
Criteria JORC Code Explanation Commentary
pending. No duplicate results are available for
26FRD001 at the time of this announcement.
All duplicate samples are assigned unique
identifiers and linked
Share your feedback
Discover